Sunday, March 8, 2009

November '08- Dual Axis Trackers

This is the first (and only) dual axis tracker installation that i've ever done. In our area, these trackers increase production by about 45%.

Joey D laying conduit in the trench.



Fastening the main support beam to the head of the mast.



tightening one of the adjustable arms





good clean energy.


4x4x2 J-Box, one of my favorites. Lots of channel strut.

scaffolding! a necessary thing when doing pole mounts.


wrapping up.

finalizing the conduit and wiring

a perfectly level tracker head...

the final product.

No comments:

Post a Comment